Operation
AC Current Measurements
AC/DC Voltage Measurements
Find Quality Products Online at:
NOTES: Read and understand all Warning and Caution statements in this operation manual prior
to using this meter. Set the function select switch to the OFF position when the meter is not in use.
WARNING: Ensure that the test leads are
disconnected from the meter before making current
clamp measurements.
Set the Function switch to the A
1.
2.
Press the trigger to open the jaw. Fully
enclose only one conductor. For optimum
results, center the conductor in the jaw.
3.
The clamp meter LCD will display the reading.
Insert the black test lead into the negative COM terminal and the red test lead into the positive
1.
V terminal.
Set the function switch to the V
2.
3.
Connect the test leads in parallel to the circuit under test.
4.
Read the voltage measurement on the LCD display.
GlobalTestSupply
www.
AC
range.
or V
AC
DC
position.
5
EX810A-en-GB_v5.1 5/17
.com
sales@GlobalTestSupply.com
Need help?
Do you have a question about the EX810 and is the answer not in the manual?
Questions and answers