Application - Bosch Heatronic 4000 Applications Manual

Controls
Hide thumbs Also See for Heatronic 4000:
Table of Contents

Advertisement

1 6 | Bosch Heatronic 4000 Controls

3.6 Application 4

Description:
Single temperature system with four modulating condensing
boilers are operated to provide an outdoor temperature reset
boiler target for a space heating load. The fourth boiler also
operates to provide heat for an indirect DHW load with priority
over space heating. Piping schematic is primary/secondary with
DHW near piping.
Essential Source (#) Settings:
ENABLE (1) = AUTO
BOSC BOILER (1) = YES
BOSC MODL (1) = "SB-Series"
ENABLE (2) = AUTO
BOSC BOILER (2) = YES
BOSC MODL (2) = "SB-Series"
Essential System Settings:
APP MODE = RSET
PUMP 1 = AUTO
PUMP 2 = AUTO
Application 4 Piping:
LEGEND:
S1 = Outdoor Sensor
S2 = Primary Supply Sensor
S3 = Primary Return Sensor
S6
P3
SB Series
DISCLAIMER: Application drawings in this manual are conceptual only and do not purport to address all design, installation, code, or safety considerations. The diagrams in this manual are for reference use by code officials, designers and
licensed installers. It is expected that installers have adequate knowledge of national and local codes, as well as accepted industry practices, and are trained on equipment, procedures, and applications involved. Drawings are not to scale.
Refer to the boiler, control and module installer manuals for additional detailed information!
Data subject to change
ENABLE (3) = AUTO
BOSC BOILER (3) = YES
BOSC MODL (3) = "SB-Series"
ENABLE (4) = AUTO
BOSC BOILER (4) = YES
BOSC MODL (4) = "SB-Series"
IDHW MODE = ON
IDHW LOCATION = NEAR
IDHW SENSOR = ON
S4 =
DHW Sensor
P1, P2 = Primary Pumps
S5 =
Boiler Inlet Sensor
P3-P6 = Boiler Pumps
S6-S9 = Boiler Outlet Sensors
P7 =
S1
S7
S8
P4
P5
SB Series
SB Series
Features:
The boiler plant is sequenced to obtain
maximum efficiency based on the boiler
types & target temperatures. For detailed
information about sequencing, rotation &
staging, refer to the Installation & Operation
Manual.
Dual primary pumps with a flow proof provide
redundancy. Pumps can be sequenced with
equal run-time rotation.
Boiler ∆T monitoring is available when using
optional boiler outlet sensors (S6 to S9) and
boiler inlet sensor (S5).
The boiler outlet sensor S9 is required for
indirect DHW operation.
IDHW Pump
S9
P7
P6
SB Series
S5
Applications Manual
DIP Settings:
External Flow Proof
/ Off
External C.A. Proof
/ Off
S4
Current Switch
P1
S2
P2
Current Switch
S3
Bosch Thermotechnology Corp.

Advertisement

Table of Contents
loading

Table of Contents