Hot-Swap Power Supply Replacement - Lenovo ThinkAgile VX2320 User Manual

Table of Contents

Advertisement

To install a hot-swap drive, complete the following steps:
Step 1.
Install the hot-swap drive.
Figure 20. 3.5-inch hot-swap drive installation
a.
Ensure that the drive tray handle is in the open position. Slide the drive into the drive bay until it
snaps into position.
b.
Close the drive tray handle to lock the drive in place.
Step 2.
Bring the cache drive online by using the procedure
storagehub.vmware.com/
Step 3.
Bring the data drive online with the procedure
https://storagehub.vmware.com/
Step 4.
Check the drive status LED to verify that the drive is operating correctly.
• If the yellow drive status LED is lit continuously, that drive is faulty and must be replaced.
• If the green drive activity LED is flashing, the drive is being accessed.
After installing all hot-swap drives:
1. If you have removed the security bezel, reinstall it.

Hot-swap power supply replacement

Follow these instructions to replace a power supply unit in the ThinkSystem VX7Y13 Series appliance.
The ThinkSystem VX7Y13 Series appliances use two power supply units. Those power supplies are
redundant when using 208 - 230V input power, allowing one power supply to meet the needs of the node.
Losing one power supply may not impact node operation; however, replace a failed power supply as soon as
possible to restore redundancy.
Table 9. Power supply options
Display Description
Feature
AVWC
ThinkSystem 550W(230V/115V) Platinum Hot-Swap
Power Supply
AVWD
ThinkSystem 750W(230/115V) Platinum Hot-Swap Power
Supply
.
Adding a Capacity Tier Device to a Disk Group
.
in
Creating a Disk Group
VX2320
.
Chapter 8
Hardware Replacement Procedures
https://
in
VX3320
53

Advertisement

Table of Contents
loading

This manual is also suitable for:

Thinkagile vx3320

Table of Contents