Cable The Server; Power On The Server - Lenovo ThinkAgile VX2320 User Manual

Table of Contents

Advertisement

Note: Items marked with asterisk (*) are available on some models only.
1
Server
2
Rail kit*. Detailed instructions for installing the rail kit are provided in the package with the rail kit.
3
Cable management arm*
4
Material box, including items such as accessory kit, power cords* and documentation

Cable the server

Attach all external cables to the server. Typically, you will need to connect the server to a power source, to
the data network, and to storage. In addition, you will need to connect the server to the management
network.
Connect to power
Connect the server to power.
Connect to the network
Connect the server to the network.
Connect to storage
Connect the server to any storage devices.

Power on the server

After the server performs a short self-test (power status LED flashes quickly) when connected to input power,
it enters a standby state (power status LED flashes once per second).
The server can be turned on (power LED on) in any of the following ways:
• You can press the power button.
32
User Guide for ThinkAgile VX2320, VX3320

Advertisement

Table of Contents
loading

This manual is also suitable for:

Thinkagile vx3320

Table of Contents