Close Codesys Project - JUMO mTRON T 570 Operating Manual

Measuring, control, and automation system operating panels
Table of Contents

Advertisement

3 Configuration
3.2.13

Close CODESYS project

Step
1
2
3
36
Activity
Close project (or end CODESYS)
➥ The PLC application is transferred to the setup program again.
Setup program: Follow the note to end CODESYS, and close with "OK"
In the setup program, exit the "project settings" dialog with "OK"

Advertisement

Table of Contents
loading

This manual is also suitable for:

Mtron t 350Mtron t 1040

Table of Contents