4 .2 .2

Setting the Unit

Remove the top and side carboard panels and the plastic film. Lift the
unit off the shipping skid with a forklift and position it on the floor in the
desired location.
WARNING: When lifting or moving the boiler: do not attempt
a
to manipulate the boiler using the top corner tripods or any
other component of the boiler.
WARNING: When lifting or moving the boiler with a forklift:
a
make sure the forks are longer than the boiler size (width or
depth) so that forks stick out as per Fig. 8.
Fig. 8
SSB 800 SA, 1000 SA and 1000 TL Forklift Handling
WARNING: Always keep the boiler in the upright position.
a
If a crane is required, the boiler must be lifted through bands.
WARNING: When lifting the boiler with crane: use bands,
a
no chains. Bands must comply with federal, state and local
rules.
WARNING: When lifting the boiler with crane: the bands
a
must be positioned according to the Fig. 9.
SSB
In multiple unit installations, it is important to plan the position of each unit
in advance. Sufficient space for piping connections and future service/
maintenance requirements must also be taken into consideration. All
piping must include ample provisions for expansion.
4"
Fig. 9
SSB 800 SA, 1000 SA and 1000 TL Crane Lifting Handling
The unit must be installed on a concrete flat floor, with no gradient in any
direction, to ensure proper condensate and water drainage (see Fig. 10).
Fig. 10 SSB 800 SA, 1000 SA and 1000 TL Installation
Installation | 13