P P r r e e - - S S t t a a r r t t u u p p
•
Verify liquid line filter driers installed.
Units with Hydronic Heat
•
Verify the entering water temperature sensor is
installed upstream of the hydronic coil.
Units with Electric Heat
•
Verify that a zone temp sensor is installed.
Electrical
•
Verify electrical connections are tight.
80
Components
•
Verify liquid line service valve, and suction and
discharge service valves if present, are open at
startup.
N N o o t t e e : : Each compressor suction line contains a low
pressure sensor that will shut the
compressor down in low pressure situations.
See
Table 35, p.
•
Ensure system components are properly set and
installed.
62.
SCXF-SVX01Q-EN