Units With Hydronic Heat; Units With Electric Heat; Electrical; Components - Trane IntelliPak SCWF 20 Installation, Operation And Maintenance Manual

Commercial self-contained signature series 20 to 110 tons
Table of Contents

Advertisement

P P r r e e - - S S t t a a r r t t u u p p
Verify liquid line filter driers installed.

Units with Hydronic Heat

Verify the entering water temperature sensor is
installed upstream of the hydronic coil.

Units with Electric Heat

Verify that a zone temp sensor is installed.

Electrical

Verify electrical connections are tight.
80

Components

Verify liquid line service valve, and suction and
discharge service valves if present, are open at
startup.
N N o o t t e e : : Each compressor suction line contains a low
pressure sensor that will shut the
compressor down in low pressure situations.
See
Table 35, p.
Ensure system components are properly set and
installed.
62.
SCXF-SVX01Q-EN

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents