Unpacking - Trane IntelliPak SCWF 20 Installation, Operation And Maintenance Manual

Commercial self-contained signature series 20 to 110 tons
Table of Contents

Advertisement

P P r r e e - - I I n n s s t t a a l l l l a a t t i i o o n n
Inspection for Concealed Damage
Visually inspect the components for concealed damage
as soon as possible after delivery and before it is
stored.
If concealed damage is discovered:
Notify the carrier's terminal of the damage
immediately by phone and by mail.
Concealed damage must be reported within 15
days.
Request an immediate, joint inspection of the
damage with the carrier and consignee.
Stop unpacking the unit.
Do not remove damaged material from receiving
location.
Take photos of the damage, if possible.
Figure 3. Typical unit shipping package
22
The owner must provide reasonable evidence that
the damage did not occur after delivery.
Repair
Notify the appropriate sales representative before
arranging unit installation or repair.
I I m m p p o o r r t t a a n n t t : : Do not repair unit until the damage has
been inspected by the carrier's
representative.

Unpacking

Commercial self-contained units ship assembled with
protective coverings over the coil and discharge
openings.Figure 3, p. 22
package.
illustrates a typical shipping
SCXF-SVX01Q-EN