Awning Rail Installation
(if needed)
NOTE: Awning rail not included.
1. Position the awning rail along the line where roof and
wall meet OR:
A. For pitched awnings: A minimum of 6" above doors or
windows
B. For flat awnings: A minimum of 2
windows
NOTE: The awning rail must be level and parallel with the
floor line of the unit (Fig.1).
A
B
Fig.1
lci1.com
1/2
" above doors or
574-537-8900
Solera
Installation and Owner's Manual
(For Aftermarket Application)
2. After determining the awning rail's proper location, mark
its position with a non-permanent method of marking.
3. Seal the back of the awning rail.
4. Align the awning rail on the wall and secure with #10 x
3/4
" screws, using all fastener holes.
Letter
A
B
Support Arm Assembly
C
Roll Tube Assembly
front facing view
C
floor line
3
Power Awning
®
Description
Awning Rail
CCD-0001261
B
Rev: 03.16.18
Need help?
Do you have a question about the Solera and is the answer not in the manual?