Aftermarket Manual Introduction Installation 1� Measure the length of the roll tube (Fig. 1). The Solera® Ground Support gives added support to the Solera® Awnings as well as Carefree Awnings and Dometic Fig�1 Awnings. Additional information about this product can be obtained from www.lci1.com/support...
Page 3
Ground Support assembly bracket (Fig. 3) as a (Fig. 6). guide. Fig�6 5� Drill a 25/64” hole at the mark made on the roll tube (Fig. 4). 7/16” Wrench Fig�4 Threaded Insert Tool www.lippertcomponents.com (574) 537-8900 Rev: 08.16 - Solera® Awning Ground Support...
Page 4
11� Loosen the adjustment knob of the Ground Support Fig�8 assembly (Fig. 10) and extend the lower leg of the assembly to the ground (Fig. 11) to support the roll tube. Re-tighten the adjustment knob. Fig�10 Adjustment Knob www.lippertcomponents.com (574) 537-8900 Rev: 08.16 - Solera® Awning Ground Support...
(Fig. 12) for added stability. Fig�14 Fig�12 Top Leg Bottom Leg 3� Remove the tightening knob from the Ground Support assembly (Fig. 15). Remove the entire assembly from the roll tube. Fig�15 www.lippertcomponents.com (574) 537-8900 Rev: 08.16 - Solera® Awning Ground Support...
Page 6
Revised editions will be available for free download at www. lippertcomponents.com. Manual information is considered factual until made obsolete by a revised version. Please recycle all obsolete materials and contact Lippert Components with concerns or questions. www.lippertcomponents.com (574) 537-8900 Rev: 08.16 - Solera® Awning Ground Support...