Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 1
Figure 1 Meter components
1 Electrolyte for the probe
2 Buffer solutions (pH 4.01 and pH
7.00)
3 Calibration beakers (with magnetic
bar inside)
4 Standard solution (1413 µS/cm)
5 Calibration beaker (with magnetic
bar inside)
6 Power supply
7 Probe holder
8 Rod
9 Probes (included with kits only)
10 Meter

Installation

Assemble the probe holder
Follow the numbered steps to assemble the probe holder and to connect
the magnetic stirrer.
English 5

Advertisement

Table of Contents
loading

Table of Contents