Mounting / Installation
5
Determine parameter set
5 Mounting / Installation
52
Building Technologies
Fire Safety
Prerequisites
The installation locations for the detector and reflector are defined according to
the planning information.
The supply network is produced, connected and checked in line with the
country-specific installation guidelines.
Sequence
1. Switch detector over to collective operation (optional)
2. Installing the detector base
3. Electrical connection
4. Installing the reflector for long distance (prism)
5. Installing the reflectors for middle distance and short distance (foil)
Information on the individual steps can be found in the following chapters.
The detector is only installed on the detector base during commissioning.
See also
Planning [➙ 34]