SYSTEM OPERATION
Run the Reprocessing Cycle
1. Close CER lid and secure using lid locks
2. Cycle Selection: Automatic FULL or LCG/RINSE
3. Confirm Time Settings: Wash and LCG
4. Select START to begin cycle
5. Basin thermometer HLD temperature verification
Complete the Reprocessing Cycle
1. Verify STOP LED now illuminated
2. Alcohol Flushing Port w/air on (Manual, air/10, Start)
3. Record Endoscope Cycle completion in Log
4. Disconnect hook up and remove and store reprocessed endoscope(s) and hook up(s)
End of Day Shutdown
1. Water Supply Valve: End of Day "OFF"
2. Clean basin, lid and gaskets (Use lint-free cloth)
MAINTENANCE
Weekly Maintenance
1. Clean CER reprocessor and basin
(use lint-free cloth)
2. Inspect CER reprocessor and hook-up components
for wear and tear
3. Lubricate O-rings with silicone oil
Monthly (as specified)
1. 1.0 micron water pre-filter (replace every 3 months
or if below 40 PSI)
2. 0.2 micron absolute filter (replace every 6 months
or if below 40 PSI) and perform waterline
disinfection
3. Active Vapor Management System (if applicable):
Charcoal filter (replace every 6 months)
Medivators Website "Resource Center"
Go to: www.medivators.com, Select "Resource Center" and "User Library" for detailed user guides and hook up
matrices, report forms and logs, and product bulletins
Medivators Customer Service Support Toll Free: Phone: 1-800-444-4729 · FAX: 1-866-421-7696
MEDIVATORS
®
, RAPICIDE
®
and INTERCEPT
®
are registered trademarks of Medivators Inc.
All other company or product names referenced are trademarks of their respective owners.
© 2016 Medivators Inc. All rights reserved. 50097-076/B
TROUBLESHOOTING
Troubleshooting
1. Review troubleshooting section in CER User
Manual
2. Service Contract Coverage and Loaner Repair
Program
Endoscope Reprocessing System
FOR FACILITY USE ONLY
Staff Name:
Training Date:
Trainer:
IN-SERVICE GUIDE
Need help?
Do you have a question about the CER-1 and is the answer not in the manual?
Questions and answers