Teach-In Of The Sensors - Wieland gesis LON R-56/0 (RC) Manual

Enocean lon gateway
Table of Contents

Advertisement

Teach-in of the sensors

6
Teach-in of the sensors
The teach-in of the sensors can be performed at any time. However, it is recommended to
not teach in the sensors until after the LON commissioning. A detailed description for this
can be found in the technical documentation for this module (at the end of this document).
19
Wieland Electric | BA000580 | 6/2009 (Rev. A)

Advertisement

Table of Contents
loading

Table of Contents