Daikin DPS005 Installation And Maintenance Manual page 9

Rebel commercial packaged rooftop systems
Hide thumbs Also See for DPS005:
Table of Contents

Advertisement

Figure 4: Roof Curb Assembly (DPS 016–028)
FRONT SIDE
NOTE: 1. Check submittal drawing for gas/water/electrical/supply/return air opening
2. Horizontal above the roof gas connection only
3. All dimensions in inches
Standard Roof Curb – Large Cabinet
www.DaikinApplied.com
1
LEFT SIDE
B
RETURN
AIR
D
D
A
9
BACK SIDE
A
E
SUPPLY
AIR
F
E
C
Roof Curb for ERW – Large Cabinet
M
I
eChanICal
nsTallaTIon
RIGHT SIDE
IM 1125-7 • REBEL ROOFTOPS

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents