New Set Day; Control Number - Siemens Siemeca Operating Instruction

Water meter
Table of Contents

Advertisement

Available languages

Available languages

(5) new set date
This display only appears when the due date is
altered during the operation period of the meter
and the new due date has not been reached.
After reaching the new due date this date
passes over to target due date.
This display disappears.

(6) Control number

The control number comprises the cumulative
volume on the last due date, the due date and
the device number.
This display can be used at a later date for
controlling the readout value (e.g. self-readers).
Siemens Building Technologies electronic GmbH – F 10105-4200/060105
3
m
GB
31
3
m
31
15

Hide quick links:

Advertisement

Chapters

Table of Contents
loading

Table of Contents