Page 1
User s M anual Model:FA-MRxx EET Group A/S Tempovej 39-41 2750 Ballerup Thank you for purchasing a Grandview projection screen. Denmark Before use, please read instructions carefully. After installation, store instructions for future reference. Main: +45 45 82 19 19 ISO9001:2000 International Certification www.eetgroup.com...
Page 2
Description Attention: > Please make sure there is no dust or dirt on the fabric surface before rolling it back to the casing > The recommended continuous working time is 50 seconds, after that you should wait for 350 seconds for another continuous operation.The motor will enter overheating protection status and stop working for every continuous 4 minuters operation, user would need to wait for a while until the motor cool Floating wall bracket...
Page 3
Instructions Installation Take out all the parts from the packaging to ensure you have all necessary components. There are three installation measures for this product, namely wall mount, ceiling mount and ceiling hang. The Button Function and Operation Instruction : installed distance can be changeable up to your needs via adjusting the slipper block, while the ideal position is the 1.Press UP button to lift the screen mounting bracket is at its nearest point to the end cap, which can reduce unnecessary vibration or noise.
Page 4
. Loosen the locking screw to lower the bracket clamp all the way down. ( Figure 6-7 ) Ceiling hang installation Each end of the screen casing needs to be supported by a hook (not provided). Ensure that the suspension system (cable and/or hook) can support the weight of the screen.
Need help?
Do you have a question about the FA-MR series and is the answer not in the manual?
Questions and answers