Table Of Contents - Bosch Climate 5000 Installation, Operation And Maintenance Manual

Modular air handling unit
Hide thumbs Also See for Climate 5000:
Table of Contents

Advertisement

2 | Table of contents

W
ELCOME
Distinguished users:
Thank you for choosing and using Bosch products!
For ease of use, please read the Manual carefully
and operate as per the steps as described in the
Manual. We will be with you all along. Please feel
free to contact us at the number and address on
the Warranty Card whenever you have any prob-
lems. We are ready to serve you.
Due to product improvement, the product you
have purchased may be slightly different from
those introduced in the Manual. We hereby apolo-
gize for the inconvenience we cause.
Important notice:
Any figures and information in this
instruction are only for reference.
• Modular air handling unit is the air side of air
conditioning system for water chiller, which
requires expertise and has strict specifications
and requirements. Therefore, it must be
installed, commissioned, operated and man-
aged (by professionally trained technical
personnel).
• The product can be used widely, except damp
environment, outdoors, the environment with
blowing dust and corrosion, and the site with
explosion hazard.
• Operating conditions:
- Power supply: 3N~/380V/50Hz
- Maximum operating pressure: ≤1.6Mpa
Our company adheres to the principle of commit-
ment to excellence, and may not inform you of
certain improvement in specification, perfor-
mance, material and structure of such products.
Sorry for the inconvenience. Please contact us for
obtaining the latest information.
8736862495(2015/07)
Table of Contents
1.1 Explanation of symbols ................................ 3
1.2 Safety information ...................... 3
1.3.1 Delivery inspection ................. 4
1.3.2 Way of transport.................... 4
1.3.3 Storage of the unit .................. 4
2 Unit introduction............................................ 6
2.1 Type introduction ....................... 6
2.2 Product introduction .................... 6
2.4 Unit symbols ........................... 7
2.4.1 Safety symbols ..................... 7
3 Unit installation.............................................. 8
3.1 Product introduction .................... 8
3.2 Equipment assembly.................... 9
3.6 Installation of siphon ....................11
4 Unit commissioning ..................................... 13
4.2 Starting and operating ..................13
4.3 Specific Prohibitions ....................13
5 Unit maintenance ......................................... 14
shutdown .................................16
6.1 Abnormal noise ........................20
6.2 Vibration ..............................20
6.3 Overcurrent............................20
6.4 Air flow insufficient ......................21
6.6 Leakage ..............................21
7 Packing list ................................................... 22
8 Notes ............................................................. 23
Climate 5000

Advertisement

Table of Contents
loading

This manual is also suitable for:

Mahup(c)-32.40Mahup(c)-06.07

Table of Contents