Delivery, Handling And Storage; Delivery Inspection; Way Of Transport; Storage Of The Unit - Bosch Climate 5000 Installation, Operation And Maintenance Manual

Modular air handling unit
Hide thumbs Also See for Climate 5000:
Table of Contents

Advertisement

4 | Key to symbols and safety instructions
Danger: Beware of electric shock!
Grounding is necessary.
Danger: Beware of electric shock!
During inspection, unit must be pow-
ered off!

1.3 Delivery, handling and storage

Each Bosch Climate 5000 modular air handling
unit (Abbreviation: MAHU)may be delivered as an
integral whole, in segments or in separate units.

1.3.1 Delivery inspection

• Bosch Climate 5000 MAHU, although have been
experienced strict factory inspection, considering
abnormal conditions may have been occurred
during transportation, please carry out inspection
and confirmation according to following items.
• Check if piping connection ports and headers
are damaged.
• Check if coils and fins are damaged.
• Manually rotating the vane to check the abnor-
mal belt and pulley (only for the unit using belt
for driving the fan).
• Check if the vane has abnormal facts (by
manually rotating the vane).
• Check if there are obvious damages of the
outer appearance of unit body and motors.
• Verify if the product specification is conformed
to the order (please verify the nameplate).
• Check the units according to the detailed list
attached to the out-of-box form.
• Check if the bolts and nuts are loosened.
If any damages and abnormals are found, please
contact to the distributor immediately. If there is an
obvious damage, please make note on the waybill
and attach the evidence, and then carry out claim
according to the instructions on the waybill.

1.3.2 Way of transport

Prior to transport the unit, please verify there are
suitable devices and tools for handling the unit,
and they shall bear the weight of unit and all the
accessories.
Notice: Risk of unit damage!
Do not put the unit on rollers!
Do not use forklift to lift the unit!
8736862495(2015/07)
Caution: Risk of falling!
Both sides of lifting steel bar shall be
applied anti-sliding pins or fixed by pipe
clamps, to avoid slip and tilt due to
shifting of gravity center.
Use lifting frame for unit lifting, and length design
of lifting frame shall be capable of avoiding all
lifting loads to prevent severe damage. Each
lifting appliance shall be capable of bearing the
overall weight of the unit and maintaining suffi-
cient weight allowance( →Page5,Fig. 1, Sche-
matic diagram of unit lifting).
Use lifting steel pipe for unit lifting. When the
delivery weight is within 2000kg, use steel pipe
with caliber and wall thickness ≥ Φ 48×6; when
the delivery weight is within 4000kg, use steel
pipe with caliber and wall thickness ≥ Φ 48×10.
Load must be carried by base, and the suspen-
sion angle must not exceed 60°.

1.3.3 Storage of the unit

If the unit can not be installed after being deliv-
ered into the site, following protections shall be
applied:
• Put the goods on the flat plate with base down-
wards, and the shell cannot be stressed directly.
• Ensure the unit is isolated from outdoor envi-
ronment, wind and rain.
• Ensure all the orifices are equipped with
protective blind plate or closing plate.
• Put the unit away from human activity place to
avoid machinery crush.
• It is suggested to close the access door and
take off the access door key to deliver it to
responsible personnel.
• It is suggested to carry out regular inspection
for the unit during the storage.
Climate 5000

Advertisement

Table of Contents
loading

This manual is also suitable for:

Mahup(c)-32.40Mahup(c)-06.07

Table of Contents