8.15 Deactivating Grounding Conductor Monitoring

If the inverter is to be installed in an IT network or another grid configuration in which deactivation
of the grounding conductor monitoring is required, deactivate the grounding conductor monitoring
as follows.
The basic procedure for changing operating parameters is explained in another section (see
Section 8.10 "Changing Operating Parameters", page 65).
Procedure:
• In the parameter group Grid monitoring > Grid monitoring > Country standard set the
parameter PE connection monitoring to Off.

8.16 Configuring the Energy Meter

You can add an energy meter to your PV system or replace an existing energy meter.
The basic procedure for changing operating parameters is explained in another section (see
Section 8.10 "Changing Operating Parameters", page 65).
Removing a detected energy meter from the PV system
If only one energy meter is detected by the inverter, this will be added to the PV system
automatically. Removal via the menu Device configuration is not possible in this case. To
remove the energy meter from the PV system, proceed as follows:
• In the parameter group System communication > Measured values > Meter on
Speedwire, set the parameter Serial number to any number (e.g. 1). In this way,
instead of the energy meter detected, the PV system will add a fictitious energy meter to
which the inverter cannot establish communication.
Procedure:
1. Activate the user interface (see Section 8.1, page 53).
2. Log in as Installer.
3. Start the installation assistant (see Section 8.5, page 61).
4. In the context menu, select [Starting the installation assistant].
5. Select [Save and next] until you get to the step Meter configuration.
6. Add or replace the desired energy meter.

8.17 Saving the Configuration in a File

Procedure:
1. Activate the user interface (see Section 8.1, page 53).
2. Log into the user interface (see Section 8.2, page 57).
3. Select the menu Device Configuration.
4. Select [Settings].
Operating manual
8 Operation
SBSxx-10-BE-en-10
69

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sbs6.0-10Sbs5.0-10

Table of Contents