Deactivating Grounding Conductor Monitoring; Configuring The Energy Meter - SMA SUNNY BOY 1.5 Operating Manual

Hide thumbs Also See for SUNNY BOY 1.5:
Table of Contents

Advertisement

SMA Solar Technology AG
Procedure:
1. Select the parameter group External communication > IEC 61850 configuration.
2. In the field Application ID, enter the application ID of the grid operator gateway. You will
receive this value from your grid operator. You can enter a value between 0 and 16384. The
value 16384 indicates "deactivated".
3. In the field GOOSE-Mac address, enter the MAC address of the grid operator gateway
from which the inverter is to receive the control commands. You will receive this value from
your grid operator.
☑ The receipt of control signals from the grid operator is activated.

8.14 Deactivating Grounding Conductor Monitoring

If the inverter is to be installed in an IT network or another grid configuration in which deactivation
of the grounding conductor monitoring is required, deactivate the grounding conductor monitoring
as follows.
The basic procedure for changing operating parameters is explained in another section (see
Section 8.9 "Changing Operating Parameters", page 54).
Procedure:
• In the parameter group Grid monitoring > Grid monitoring > Country standard set the
parameter PE connection monitoring to Off.

8.15 Configuring the Energy Meter

You can add an energy meter to your PV system or replace an existing energy meter.
The basic procedure for changing operating parameters is explained in another section (see
Section 8.9 "Changing Operating Parameters", page 54).
Removing a detected energy meter from the PV system
If only one energy meter is detected by the inverter, this will be added to the PV system
automatically. Removal via the menu Device configuration is not possible in this case. To
remove the energy meter from the PV system, proceed as follows:
• In the parameter group System communication > Measured values > Meter on
Speedwire, set the parameter Serial number to any number (e.g. 1). In this way,
instead of the energy meter detected, the PV system will add a fictitious energy meter to
which the inverter cannot establish communication.
Procedure:
1. Activate the user interface (see Section 8.1, page 43).
2. Log in as Installer.
3. Start the installation assistant (see Section 8.4, page 50).
4. In the context menu, select [Starting the installation assistant].
Operating manual
8 Operation
SBxx-1VL-40-BE-en-13
57