Single Phase Connections
Single phase connections are made at load receptacles located by the operator panel, see
Figure 3-3. Simply open the rear panel access door and make the connections. When the panel
door is closed, the connections are weather tight.
For power to be applied to
these receptacle, the Output
Voltage Selector Switch must
be in the 120/240V position.
Three Phase Connections
Three phase connections are made at L1, L2, L3 and N connections shown in Figure 3-4.
For power to be applied to these
terminals, the Output Voltage
Selector Switch must be in the
120/208V or 277/480V positions.
MN2416
Figure 3-3 Receptacle Panel (Single Phase)
TS25
Use mating plug for a
CS6369 250V 50A
receptacle.
TS45/80
Use mating plug for a
CS6369 250V 50A
receptacle.
240V(50A)
TS130/175
Use mating plug for a
CS6369 250V 50A
receptacle.
240V(50A)
Figure 3-4 Three Phase and Remote Start Connections
Customer Connections
L1, L2, L3 and N
240V(50A)
240V(50A)
240V(50A)
240V(50A)
240V(50A)
240V(50A)
120V(20A)
120V(20A)
120V(20A)
240V(50A)
120V(20A) 120V(20A) 120V(20A) 120V(20A)
RR1 RR2
Remote Start Connections
Receiving & Installation 3-5
120V(20A)
120V(20A)