Step 3: Unpack The Switch - NETGEAR GS728TPv2 Hardware Installation Manual

24-port and 48-port gigabit poe+ smart managed pro switches with 4 sfp ports
Hide thumbs Also See for GS728TPv2:
Table of Contents

Advertisement

24-Port and 48-Port Gigabit PoE+ Smart Managed Pro Switches with 4 SFP Ports
When unpacking a static-sensitive component from its shipping carton, leave it in the antistatic package
until you are ready to install it. Just before unwrapping the antistatic package, discharge static electricity
from your body.
Before moving a sensitive component, place it in an antistatic container or package.
Handle all sensitive components in a static-safe area. If possible, use antistatic floor pads, workbench
pads, and an antistatic grounding strap.

Step 3: Unpack the Switch

The following figure shows the package contents for the switch.
Figure 8. Switch package contents
Check the contents of the boxes to make sure that all items are present before installing the switch.
To check the package contents:
1.
Place the container on a clean flat surface, and cut all straps securing the container.
2.
Unpack the hardware from the boxes by carefully removing the hardware and placing it on a secure
and clean surface.
3.
Remove all packing material.
4.
Verify that the package contains the following items:
a.
Switch
b.
Power cord
c.
Rubber footpads for tabletop installation
Installation
22

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Gs752tpv2Gs728tppv2Gs752tpp

Table of Contents