Step 6: Connect Devices To The Switch; Step 7: Check The Installation; Step 8: Apply Power And Check The Leds - NETGEAR GS728TPv2 Hardware Installation Manual

24-port and 48-port gigabit poe+ smart managed pro switches with 4 sfp ports
Hide thumbs Also See for GS728TPv2:
Table of Contents

Advertisement

24-Port and 48-Port Gigabit PoE+ Smart Managed Pro Switches with 4 SFP Ports

Step 6: Connect Devices to the Switch

The following procedure describes how to connect devices to the switch's RJ-45 ports. The switch supports
Auto Uplink technology, which allows you to attach devices using either straight-through or crossover cables.
Use a Category 5 (Cat 5), Cat 5e, or Cat 6 cable that is terminated with an RJ-45 connector.
Note
Ethernet specifications limit the cable length between the switch and the attached
device to 328 feet (100 meters).
To connect devices to the switch's RJ-45 ports:
1.
Connect a PoE or non-PoE device to an RJ-45 network port on the switch.
2.
Verify that all cables are installed correctly.

Step 7: Check the Installation

Before you apply power to the switch, perform the following steps.
To check the installation:
1.
Inspect the equipment thoroughly.
2.
Verify that all cables are installed correctly.
3.
Check cable routing to make sure that cables are not damaged or creating a safety hazard.
4.
Make sure that all equipment is mounted properly and securely.

Step 8: Apply Power and Check the LEDs

The switch does not provide an on/off power switch. The power cord connection controls the power.
Before connecting the power cord, select an AC outlet that is not controlled by a wall switch, which can turn
off power to the switch.
To apply power:
1.
Connect the end of the power cord to the AC power receptacle on the back of the switch.
2.
Plug the AC power cord into a power source such as a wall socket or power strip.
3.
Check to see that the LEDs on the switch light correctly.
When you apply power, the Power LED on the switch front panel lights and the port LEDs for attached
devices light.
Note
After you apply power, the Power LED lights solid yellow while the switch starts. After
two or three minutes, the switch completes its startup process and the Power LED
turns from amber to solid green.
Installation
25

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Gs752tpv2Gs728tppv2Gs752tpp

Table of Contents