Roof Curbs - Daikin Maverick I MPS A03C Installation And Maintenance Manual

Heating & cooling
Table of Contents

Advertisement

Roof Curbs

Roof Curbs (Full Perimeter): 3–5 Tons [10.6–17.6 kW]
• One available height (14" [356 mm]) for all models.
• 2" [51 mm] × 4" [102 mm] nailer provided
• Quick assembly corners for easy installation
• Insulating panels provided
• Opening provided in bottom pan to match the
"Thru-the-Curb" electrical connection opening provided
on the unit
• Sealing gasket (28" [711 mm]) provided with roof curb
• 18 gauge galvanized steel base pan
Figure 36: Typical Roof Curb Installation: MPS A03C – A05C
www.DaikinApplied.com
43
a
CCessorIes
IM 970-2 • MAVERICK I ROOFTOP

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents