Wall Mounting Instructions - NTI FTV110 Installation And Operation Manual

Ftv series
Hide thumbs Also See for FTV110:
Table of Contents

Advertisement

FTV I&O Manual
Leave the Top Wall-mount Bracket (A) intact
and remove the Bottom Wall-mount Bracket
(B) that is attached to the bottom-back of the
boiler.
Secure Bottom Bracket (B), removed from the
bottom back of the boiler in Step 1, to a solid
wall using field supplied lag screws (anchors
when mounting to a concrete wall) that are
adequate to support the weight of the appliance
when filled with water (refer to Table 2-1
Specifications). Ensure the bracket is level and
flush to the wall. Mounting holes to be on the
bottom with flange pointed upward and angled
away from the wall.
Mount the boiler to the wall by aligning the
two wall mount brackets, Top Bracket (A)
with the Bottom bracket (B). Slide the top
bracket fastened to the boiler down over the
wall-mounted bracket until it hooks.
Once the boiler is resting securely on the wall,
attach the L-shaped Brackets (C) to the
underside of the appliance using the mounting
hardware supplied in the boiler kit box – adjust
to plumb the boiler. Anchor the L-shaped
Brackets (C) to the wall as shown using field
supplied hardware.
Figure 3-2 Wall Mounting Instructions
Top Bracket (A)
Bottom
Bracket (B)
L-shaped Brackets
(C) shipped with
Failure to follow instructions may
result in fire, serious injury, or death.
This unit requires two people to lift it
or damage and injury may result.
Bottom
Bracket (B)
Ensure Bracket
(A) fully inserts
into Bracket (B)
boiler kit box
│Boiler Location
Boiler
Wall
(A)
(B)
9

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ftv150Ftv150cFtv190cFtv110cFtv190

Table of Contents