Installing Power Modules; E300 Ac Power Modules - Dell Force10 E300 Quick Start Manual

Hide thumbs Also See for Force10 E300:
Table of Contents

Advertisement

Step
Task
Install the grounding cables to the ground studs. The grounding cable must
3
comply with your local electrical codes in size and color (typically the
color is green or green with yellow stripe).
listed 2-hole lug with 1/4-inch holes on 3/4-inch spacing.
Cable Connector Required for E1200iDC PEM
High-strand-count
All measurements in inches.
Replace the two washers and nuts on the studs.
4
With a 7/16-inch box or socket wrench, tighten the nuts (torque should
5
not exceed 25 inch/lbs).
Connect the opposite end of the grounding cable to the nearest
6
appropriate facility grounding post.

Installing Power Modules

This section provides instructions to install AC Power Supply Units (PSUs) and
DC Power Entry Modules (PEMs) in each E-Series system. E-Series systems
may contain only one type of power module—AC or DC.
Unless otherwise stated, each AC and DC power supply for each E-Series
system is shipped with a Dell Force10-approved power cord and only that cord
should be used to connect the power supply to the appropriate outlet.
WARNING: To prevent electrical shock, make sure the system is grounded
properly. If you do not ground your equipment correctly, excessive emissions
may result. Use a qualified electrician to ensure that the power cables meet
your local electrical requirements.

E300 AC Power Modules

The E300 system requires a minimum of two AC Power Supplies.
NOTE:
Grounding cables must be terminated only with a UL-
conductor
0.267
diameter
2 Holes
0.750"
Installing the Hardware
11

Advertisement

Table of Contents
loading

This manual is also suitable for:

Force10 e600iForce10 e1200i

Table of Contents