Operation - jbc AL-9A Reference Manual

Solder feed station. al series. 230v ,120v,100v
Hide thumbs Also See for AL-9A:
Table of Contents

Advertisement

Available languages

Available languages

OPERATION

Place the solder reel in the stand and set the 2
screws.
Place the toolholder metal base and the solder reel
(maximum weight 1kg). Press the 2 screws.
Toolholder metalbase
For a proper installation, please proceed as follow:
1
. Place the control in the position showed in the
graphic in order to open the dragging mechanism.
2
. Loosen the solder reel guide screws of the control
unit.
2
1
3
. Place the tubes and guides set in the control unit.
Tighten the screws.
The guide set for the solder thread supplied with
the control unit is specially designed for solder reels
diammeter of 0,9 to 1 mm.
If you wish to use other solder reel sizes, you
can order other 3 guide sets as accessory (see
accessories).
3
3
ENGLISH
2
3
1

Advertisement

Table of Contents
loading

This manual is also suitable for:

Al-1aAl-2a

Table of Contents