Scope - Eltek Flatpack Power Tower Operation Manual

Table of Contents

Advertisement

3 Scope

3 Scope
Flatpack Power Systems are made up of Power Shelves for plug-in rectifier modules, a DC distribution that
includes a monitoring and control unit and optional Batteries.
The power shelves include the necessary amount of rectifiers needed in the system. The DC distribution include
fuses, breakers (MCB`s), load and/or battery disconnect units as well as a Monitoring & Control Unit.
This Operation Guide contains information about the Flatpack Power Tower distribution. It includes information
about alarm connections, DC connections and optional equipment, together with a description on how to install
and commission the distribution.
7(48)
Operation Guide, Flatpack Power Tower
351401.013v2 July 2003

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Flatpack Power Tower and is the answer not in the manual?

Table of Contents