Eltek Flatpack Power Tower Operation Manual page 17

Table of Contents

Advertisement

Batt. Bank No. 1
(Batt.fuse 1)
5.5.3 Procedure for connection of DC cables
Installation Step
1 D
ECIDE CABLE ENTRY
2 D
RESS THE CABLES INTO THE
,
CABINET
CUT TO LENGTH AND FIT
CABLE LUGS OR FERRULES IF
APPLICABLE
3 F
ASTEN THE CABLES TO THE
TERMINALS
6 F
ASTEN ALL CABLES AWAY FROM
SHARP EDGES AND RELIEVE ANY
STRAIN FROM THE TERMINALS
Operation Guide, Flatpack Power Tower
351401.013v2 July 2003
Comments
The cables or copper bars can enter from top
Use cable cutter and cable lug crimper fitted with
appropriate sized die.
For cables/wires
The holes are dimensioned for M8 bolts, which are fitted
at delivery
See chapter "connections/terminal" for connection
DC
details
Ensure that the cables do not impose any stress to the
terminal connections.
Ensure that the cables do not rest against any sharp edges
.
inside the cabinet
5 Installation Procedures
Batt. Bank No. 2
(Batt.fuse 2)
OK
17(48)

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Flatpack Power Tower and is the answer not in the manual?

Table of Contents