Hitachi L300P-110L Instruction Manual page 38

L300p series three phase input 200/400v class
Table of Contents

Advertisement

3.2 Test Run
This is the common connection example. Please refer to 4.1 Digital Operator, for the detailed use of the
digital operator (OPE-SR).
(1) To input the operation setting and the frequency setting from terminal control.
Three Phase
Power supply
Operating box
(OPE-4MJ2)
(OPE-8MJ2)
(Arrangements)
[1] Please make sure that the connections are correctly secure.
[2] Turn the ELB ON to supply power to the inverter.
(The red LED "POWER" on the digital operator should illuminate.)
[3] Set terminal with the frequency setting selection.
Set A001 as indication code, press the
Set 01 with the
terminal. (Indication code turns back to A001.)
[4] Set terminal with the operation setting selection.
Set A002 as indication code, press the
Set 01 with the
terminal.
(Indication code turns back to A002.)
[5] Set monitor mode.
When monitoring the output frequency, set indication code to d001, and press the
Or when monitoring the operating direction, set indication code to d003, press the
[6] Input starting operation setting.
Turn ON between [FW] and [CM1] of terminal.
Impress voltage between [ O ] and [ L ] of terminal to start operation.
[7] Input ending operation setting.
Turn OFF between [FW] and [CM1] to stop slowly down.
ELB
R
R
S
S
T
T
FW
5
(RV)
1
FM
TH
CM1
PLC
P24
H
H
O
O
OI
O2
AM
AMI
L
L
FUNC
key or the
key, press the
1
2
FUNC
key or the
key; press the
1
2
U
Motor
V
W
PD
Direct current reactor
P
Digital operator
RB
Braking unit
N
AL0
AL1
Alarm output contact
AL2
11A
11C
12A
12C
SP
SN
RP
SN
G
Ground
key once. (Two figures are shown.)
key once to set the frequency setting for
STR
key once. (Two figures are shown.)
key once to set the operation setting for
STR
3-4
Chapter 3 Operation
FUNC
key once.
key once.
FUNC

Advertisement

Table of Contents
loading

Table of Contents