Installation - Kahn Easidew Plus User Manual

Portable hygrometer
Table of Contents

Advertisement

INSTALLATION

2
INSTALLATION
On delivery, please check that all the following standard components are present in the
packing box:
Easidew Plus Portable Hygrometer
Swagelok
Swagelok
Battery charger
Power cord
3 pole ¼" jack plug (inside lid)
User manual
Certificate of calibration
0.4mm orifice
Before using the Easidew Plus Portable Hygrometer for the first time it is recommended
that the battery pack is charged for a minimum of 12 hours.
The case has a pressure relief valve on the exterior below the handle. When closed,
the case is completely sealed. If the instrument is taken through altitude changes, a
pressure differential will occur within the case. If this occurs: Before opening the lid,
open the black pressure relief valve by one turn (counter-clockwise) for a few seconds.
This will equalize the pressures. When the case has been opened, insure that the
pressure relief valve has been fully closed.
The supplied Swagelok
can be connected to the instrument.
See below:
1. Slip the nut over the
1. Slip the nut over the
machined ferrule end of
machined ferrule end of
the port connector
the port connector
3. While holding the fitting
body steady, tighten the
nut one-quarter turn
2
Easidew Plus Portable Hygrometer User's Manual
1/4" metering valve
®
1/4" tube port adaptor
®
port adaptor needs to be assembled before the metering valve
®
3. While holding the fitting
body steady, tighten the
nut one-quarter turn
2. Insert the port connector
2. Insert the port connector
into the end connection and
into the end connection and
finger-tighten the nut
finger-tighten the nut
97478 Issue 1, October 2014
Do not use the Swagelok gap inspection
!
Do not use the Swagelok gap inspection
gauge with machined ferrule ends.

Advertisement

Table of Contents
loading

Table of Contents