Download Print this page

SAB goblin 570 kyle stacy edition User Manual page 24

Advertisement

Chapter 13, Boom Assembly
Bags 7.9, 7.10, 7.11
A
DETAIL A
Locking Element
Tail Assembly
(H0249-S)
DETAIL C
Flat Head Cap
Screws M3x8mm
(HC134-S)
Tail Boom Assembly
Finishing
Washer M3
(H0007-S)
Socket Head Cap
Screws M3x10mm
(HC056-S)
Page 22
Tail Boom Assembly
Yellow/Orange Tail Boom ( H0300-S)
White Tail Boom (H0301-S)
Double Sided Tape
(HA022-S)
Block Nylon
Screws
(H0296-S)
Boom Block
(H0298-S)
Metric Hex
Nylon Nut M3
(HC206-S)
Double
Sided Tape
Socket Head Cap
Screws M3x10mm
(HC056-S)
B
Install H0260-S On The Boom
Before mounting H0260 on the boom, we recommend to first
tighten the M2.5 screw into the hole to open up the threads a bit.
This will allow for easier installation.
Double
Sided Tape
Plastic Ball Link
(H0066-S)
Threaded Rod M2.5x40mm
(HC242-S)
15mm
Locking Element Tail Assembly ...x2
Locking Element Tail
(H0249-S)
Metric Hex Nylon Nut M3
(HC206-S)
Note:
Carbon Road Support
(H0394-S)
Tail Push Rod
(HC240-S)
15mm
Approx 725mm
C
DETAIL B
4x
2.5x668mm
7mm
7mm
Socket Head Cap
Screws M2.5x12mm
(HC026-S)
H0395

Advertisement

loading