Download Print this page

SAB goblin 570 kyle stacy edition User Manual page 17

Advertisement

Preliminary Head Setup
Adjust the linkages as shown. You can change the tracking
without disconnecting the plastic ball links by inserting a
small tool through the rod hole and turning it.
Linkage Rod A
Assembly
Linkage Rod B
Assembly
Head System
Assembly
Chapter 8, Assembling The Modules
Metric Hex Nylon
Nut M3
(HC206-S)
Swashplate
Swashplate Assemly
Assemly
Linkage Rod A Assembly . . . .x2
Left Thread
Plastic Ball Link
(H0066-S)
(Initial length for the rods from the swash plate to the Blade Grip.)
Linkage Rod B Assembly . . . ..x3
Plastic Ball Link
(H0066-S)
(Initial length for the rods from the servos to the swash plate.)
Tray 1, Bags 5.5, 5.6
Head Cap Screw
Shouldered M3x20
(HC082-S)
Socket Head Cap
Screw M3x12mm
(HC062-S)
Uniball
M3H3
(H0065-S)
Approx. 62.5mm
Right Thread
Linkage Rod M2.5x33mm
(H0237-S)
Approx. 44mm
Set Screw
M2.5x15mm
(HC146-S)
Uniball
M3H18
(H0063-S)
Uniball
M3H3
(H0065-S)
Page 15

Advertisement

loading