Clearances - Raypak RAYTHERM 0133-4001 Installation And Operating Instructions Manual

Raypak boiler user manual
Hide thumbs Also See for RAYTHERM 0133-4001:
Table of Contents

Advertisement

CLEARANCES

CLEARANCES FROM COMBUSTIBLE SURFACES
(All dimensions are in inches)
133
Derived from National Fuel Gas Code, Table 6.2.3(a)
Note 1:
Combustible floor shield is required when boiler is to be
installed on a combustible surface. (See ordering infor-
mation on pg. 4.)
Note 2:
Servicing Clearances: Provide at least 24" (Models
133-1826), 48" (Models 2100-4001) in front of unit for
removal and servicing of the Controls & Burner Tray.
Provide at least 18" on side opposite water connections
for deliming of Heat Exchanger Tubes.
*Vent includes factory-supplied drafthood and does not
include field-supplied vent systems above the draft-
hood. On Models 2100-4001 drafthood is built into
boiler.
MODEL
181 to
514 to
926 to
401
824
1826
REDUCTION OF CLEARANCES TO PROTECTED
SURFACES
Note: The boiler shall be installed in a space large in
comparison to the size of the boiler. Large space is
defined as having a volume at least sixteen (16) times
the total volume of the boiler.
2100 to
4001
Derived from National Fuel Gas Code, Table 6.2.3(b)
6

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents