Clearances - Raypak 399B-2339B Installation & Operating Instructions Manual

Series h & wh
Table of Contents

Advertisement

In addition, the heater shall be installed such that the
gas ignition system components are protected from
water (dripping, spraying, rain, etc.) during appliance
operation or service (circulator replacement, control
replacement, etc.).

Clearances

Indoor Installations
Minimum Clearance
Heater
from Combustible
Side
Surfaces
Floor*
Rear
Water Side
Other Side
Top
Front
Open
Vent
* DO NOT install on carpeting.
Table E: Clearances – Indoor Installations
TOP VIEW
FRONT VIEW
Venting not shown for clarity. Heater must be vented
per instructions in this manual
Fig. 7: Minimum Clearances from Combustible
Surfaces – Indoor Installations
Recommended
Service
Clearance
0"
0"
1"
24"
12"
24"
1"
24"
1"
1"
24"
2"
2"
When installed according to the listed minimum clear-
ances from combustible construction, these heaters
can still be serviced without removing permanent
structural construction around the heater. However, for
ease of servicing, we recommend a clearance of at
least 24 in. in front, and at least 12 in. on the water
connection side. This will allow the heater to be serv-
iced in its installed location without movement or
removal of the heater.
Service clearances less than the minimums may
require removal of the heater to service either the heat
exchanger or the burner tray. In either case, the heater
must be installed in a manner that will enable the
heater to be serviced without removing any structure
around the heater.
Outdoor Installations
These heaters are design-certified for outdoor installa-
tion. Heaters must not be installed under an overhang
that is less than 3 ft from the top of the heater. Three
sides must be open in the area under the overhang.
Roof water drainage must be diverted away from
heaters installed under overhangs.
Min. Clearance
Heater
from Combustible
Side
Surfaces
Front
Rear
Water Side
Other Side
Top
Unobstructed
Vent
Table F: Clearances – Outdoor Installations
These clearances are required when the outdoor
vent cap is used. If installing the heater outdoors
with a vent stack, the indoor clearances may be
utilized.
The combustion air intake hood MUST be used for
outdoor installations. The hood is shipped loose and
installed on the side of the heater over the filter box at
the jobsite.
11
Recommended
Service
Clearance
Open
24"
12"
24"
36"
36"
36"
36"
36"
N/A
N/A

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents