11. PLANNED MAINTENANCE

Performing the following inspections can prevent many issues. Be sure to turn off the water supply
before servicing the system and be sure that replacement parts have been installed according to
supplied drawing specifications.
Refer to A
PPENDIX
D
:
AILY
Clean machine after use (
Check and monitor service pressures and temperatures prior to and during operation per operations manual
Monitor pH levels of detergents (
Check the keg couplers, spear adaptor, and locking mechanism in the handle for damage. Damage may be
transferred to the keg valve seal; Change damaged parts as necessary.
W
:
EEKLY
Check head seal connections and "O" rings for wear and damage. Replace as necessary
Check for leaks on all service lines and unions. Replace seals and/or tighten as necessary
Check for loose hardware. Tighten as necessary
Check for loose wire terminations. Tighten as necessary
M
:
ONTHLY
Check dosing units for accuracy and operation in line with operations manual recommendations. Adjust if
necessary
Check Infrared Liquid Sensor for cleanliness and good operation by removing from pipework and verify
sensor tip is clean and polished. Clean and/or replace if necessary
Clean out all airline filters and drain any condensate
Check all push-button switches and indicator lamps for damage. Replace as necessary
Check all spare parts inventory levels. Replace as necessary.
Q
:
UARTERLY
Check pressure gauges for accuracy. Adjust and/or replace if necessary
Check the transfer system alignment and keg placement over the connection heads. Lubricate, make
adjustments, and replace worn parts as necessary
Check all hoses for leaks and/or wear. Replace as necessary
Check tri-clover seals for wear and/or damage. Replace as necessary
Check all electrical power connections and motor overload settings. Reset if necessary
Check pumps for leaks
Y
:
EARLY
Check process valve, seats, "O" rings, and seals for wear and damage. Replace as necessary
Inspect pump seals for wear or damage. Replace as necessary
Inspect all air cylinder seals for wear and/or damage. Replace as necessary
Check nylon air lines for leaks and continued flexibility. Replace as necessary
Check all solenoid valves for proper operation. Replace if necessary
Back To TOC
SQUIRE PLUS 2 OPERATIONS MANUAL
A – I
& A
DENTIFYING
NALYZING
See S
10, E
ECTION
See S
ECTION
PROCESS & PACKAGING, INC.
P
, for any problems encountered.
ROBLEMS
C
for details)
XTERIOR
LEANUP
9, S
16 for details)
TEP
(See A
www.iddeas.com
C –S
P
)
PPENDIX
PARE
ARTS
P
AGE
37