16. SCAV stops after a pre-set time
17. SCAV valve closes and Racker Drain turns on
18. Racker Drain remains open for two more seconds, to depressurize coupler and hoses
19. Remove Product Coupler with a half-turn counter-clockwise and secure to Product Cup
20. Replace the filled keg with a sterilized empty until all product is used
21. When all filling is done for the day, go to Section 10 – CIP P
I
: After the First Keg has been processed through both the wash and fill
MPORTANT
sequences, remove it and do not allow it to enter the full Keg warehouse. This
will ensure that all the Machine systems were properly primed, prior to
commencing actual production. Return this keg to be washed and filled again.
SQUIRE PLUS 2 OPERATIONS MANUAL
PROCESS & PACKAGING, INC.
www.iddeas.com
ROCEDURE
(no blowback)
P
33
125
AGE
OF