Cycle Times - IDD Processing & Packaging SQUIRE PLUS 2 Operation Manual

2-head washer / filler
Table of Contents

Advertisement

7.

CYCLE TIMES

Wash Water Pre-soak
Air Purge Pre-soak
Wash 1 Water (pulse on long seq.)
Low Flow Wash 1 (pulse on long seq.)
Air Purge
Wash 2 Detergent (Pulsed Wash)
Low Flow Wash 2
Air Purge
Wash 3 Water (Pulsed Wash)
Low Flow Wash 3
Wash 3 fill
Sterilize Hold
Depressurize
CO
purge
2
CO
pressurize
2
Product
Gas Scavenge
De-pressurize time
F
ILL
5 gallon and 20 liter kegs
¼ barrel and 30 liter kegs
½ barrel and 50 liter kegs
NOTE: Output is subject to keg, keg valve style, and wash sequence used.
Back To TOC
SQUIRE PLUS 2 OPERATIONS MANUAL
S
"P
QUIRE
Oxine Machine With Allen Bradley PLC
W
H
ASH
EAD
F
H
ILL
EAD
H
O
EAD
UTPUT
PROCESS & PACKAGING, INC.
2" S
T
LUS
EQUENCE
IMES
R
S
EGULAR
EQUENCE
3 sec.
Event
7.5 sec.
7.5 sec.
Event
15 sec.
15 sec.
Event
7.5 sec.
10 sec.
3 sec.
10 sec.
5 sec.
10 sec. / Event
2.5 sec.
R
S
EGULAR
EQUENCE
Event
4 sec.
2 sec.
R
S
EGULAR
EQUENCE
Up to 30 per hour
Up to 28 per hour
Up to 25 per hour
www.iddeas.com
L
S
ONG
EQUENCE
3 sec.
Event
15 sec.
15 sec.
Event
30 sec.
30 sec.
Event
7.5 sec.
10 sec.
3 sec.
10 sec.
5 sec.
10 sec. / Event
2.5 sec.
L
S
ONG
EQUENCE
Event
4 sec.
2 sec.
L
S
ONG
EQUENCE
Up to 22 per hour
Up to 20 per hour
Up to 17 per hour
P
15
125
AGE
OF

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents