2, Dhw, Cooling); Time Program Functions - Fujitsu WATERSTAGE 112 Maintenance Document

Waterstage series 3 phase air/water heat pump split system, single service
Hide thumbs Also See for WATERSTAGE 112:
Table of Contents

Advertisement

Heat Pump, Split System, Single Service, 3 phase
6.3.3 Time Program Functions (heating circuit 1 & 2, DHW, cooling)
Several control programs are available for the heating
circuits and the production of DHW. They are initiated
in "Automatic" mode and control the change in
temperature levels (and therefore the associated
setpoints, reduced and comfort) via the adjusted
changeover times.
Changeover Points
Line no.
HC1
HC2
4/DHW
500
520
560
501
521
561
502
522
562
503
523
563
504
524
564
505
525
565
506
526
566
Standard Program
Line no.
516, 536, 576, 616
All time programs can be reset to factory settings.
Each time program has its own command line for this
reset action.
Maintenance Document 1394-1
Programming line
5
600
Preselection
(Mon-Sun / Mon-Fri / Sat – Sun / Mon...Sun)
st
601
1
phase On
st
602
1
phase Off
nd
603
2
phase On
nd
604
2
phase Off
rd
605
3
phase On
rd
606
3
phase Off
Programming line
Default values
(No /Yes)
Enter changeover times:
Changeover times can be adjusted in a combined
way, i.e., identical times for several days or distinct
times for certain days. Preselecting groups of days
(e.g., Mon...Fri and Sat...Sun) having the same
changeover
times
makes
changeover program considerably shorter.
In this case, individual settings will be lost!
adjustment
of
the
73

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Waterstage 140Waterstage 160

Table of Contents