Mira Select Flex Installation And User Manual page 12

Thermostatic mixer
Hide thumbs Also See for Select Flex:
Table of Contents

Advertisement

11. insert the wall plugs and attach the mixer to
the wall with the screws provided.
Note! For stud partition installations alternative
fixings may be required (not supplied) to fix the
mixer to the rear face of the wall cavity or to a
timber noggin.
outlet Pipe to
Fittings
hot Supply
12. remove the two shroud screws (retain for later
use) and remove the building-in shroud from
the mixer.
13. Make sure that the olives are fitted, connect
the hot and cold supply pipes and tighten the
compression nuts.
14. connect the outlet pipework and install the
rac assembly or Bir assembly, before
continuing with the installation of the mixing
valve.
RAC assembly, go to section: 'installation,
RAC Assembly'.
BIR assembly, refer to your shower fittings
installation and user guide then continue with
instruction 15.
15. turn on the water supplies and check for
leaks.
cold Supply
Screws
12
16. Refit the building-in shroud to the mixer using
the two shroud screws removed earlier.
17. Using the 'Finished Wall indicator' on the
building-in shroud as a guide, finish the wall,
e.g. tiles.
Caution! Make sure that the finished wall
is within the maximum and minimum limits
and to an even depth (no greater than 2 mm
variation) or the control components will not
fit correctly.
Minimum
finished wall
surface
Maximum
finished wall
surface
18. remove the two shroud screws (retain for later
use) and remove the building-in shroud.
19. Fit the concealing plate and control assembly,
refer to section: 'Control Assembly'.
Finished Wall
F9802
Min
Max

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents