Gas Connections - Beretta NOVELLA 31 RAI Installation Manual

Cast iron base
Table of Contents

Advertisement

3.6

Gas connections

Novella boilers must be connected to the
methane or LPG gas supply in conformity to
applicable standards (fig. 3.5).
Perform the following checks before making
the connection:
- check that the boiler is compatible with the
type of gas supply
- check that the gas supply pipes are thor-
oughly clean
Fit a suitably sized filter in the gas supply pipe
if the gas supply contains any solid particles.
b
The gas supply line must be suitable for
the flow rate demanded by the burner.
The gas supply must also be equipped
with all the necessary safety and control
devices required by applicable legisla-
tion and standards.
b
On completion of the installation, check
that all joints are sealed in conformity to
the relevant installation standards.
DESCRIPTION
16
A
3.7
Gas supply conversion
The boiler comes ready for use with methane
gas (G20), but can be converted to work with
LPG (G30/G31) using the conversion kit pro-
vided and the LPG gas valve contained in the
relevant kit. Conversion must be performed by
the manufacturer's Technical Assistance
Service. The boiler can be converted even
after installation. To do so, proceed as follows.
REPLACING THE NOZZLES
- Remove the front panel from the casing.
- Unscrew the two nozzles from the methane
burner and replace them with the LPG noz-
zles, using the aluminium seals provided in
the kit (fig. 3.6).
MODEL
31 RAI
45 RAI
28
36
mm
GAS - Gas supply
GAS
Fig. 3.5
Fig. 3.6

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Novella 45 rai

Table of Contents