Power Installation - Nexcom NIO200IAG User Manual

Table of Contents

Advertisement

Connect connector
into NIO200 enclosure,
tighten locknut with
body.
To install the conduit, user should implement with Flexible Metal Conduit, Liquid-tight which
meets UL360 standard. Here is the requirement of the diameter and size information for the
selection of Metal Conduit that mate with NIO200 conduit connectors.
3.2.2

Power installation

November 2017
of ferrule cover the
conduit, over-tighten
may enlarge conduit
diameter and loosen
Insert the conduit with
ferrule into connector
of NIO200 enclosure.
1. Prepare DC power source (12~48 VDC)
2. If use external DC power source, please
Push gland packing and
cap nut forwards to
NIO200 conduit
connector and tighten
the cap nut
or standard PoE facility such PoE switch
or PoE injector.
carefully check if the polarity of power
Page 16

Advertisement

Table of Contents
loading

Table of Contents