Step 1: Activating the System
11. Close the Connection Unit external cover: Attach the cover and secure it by tightening the six screws
with a torque of 1.2 N*m / 0.9 ft.*lb.
12. Ensure proper conduit sealing; inspect the entire conduit run and use standard conduit sealants to
avoid water penetration.
13. Turn ON the C onnection Unit switch. I f an additional external DC switch is installed between the
power optimizers/ battery and the inverter(s) then turn it ON.
A status screen similar to the following appears on the LCD panel:
V a c [ V ]
2 4 0 . 7
P _ O K :
- - - - - - - - - - - - - - -
14. Verify that the following information appears on the LCD panel:
P_OK: Appears only upon pairing process completion and first telemetry reception from the
l
power optimizers. Indicates connection to the power optimizers and that at least one power
optimizer is sending monitoring data.
000/000: Appears only upon first telemetry reception from the power optimizers. Indicates the
l
number of power optimizers that have been paired to this inverter.
S_OK: The connection to the SolarEdge monitoring platform is successful (should appear only if
l
the inverter is connected to the server).
Vac [V]: The grid AC output voltage. Verify the correct value.
l
Vdc [V]: The DC input voltage of the longest string connected to the inverter. T here should be a
l
safety voltage of 1V for each power optimizer in the string.
NOTE
A measurement error on the inverter LCD of ±3 V is acceptable.
Pac [w]: The AC output power (should be 0.0 since the inverter is OFF).
l
OFF: The inverter ON/OFF switch is in the OFF position.
l
48
V d c [ V ]
P a c [ w ]
1 4 . 1
0 . 0
0 0 0 / 0 0 0
< S _ O K >
O F F
SolarEdge-StorEdge Installation Guide MAN-01-00262-1.3