Wieland Samos PRO COMPACT Manual page 62

Hide thumbs Also See for Samos PRO COMPACT:
Table of Contents

Advertisement

Step 2: Installation of gateways or expansion modules
 Using a screwdriver, pull the snap-on foot outward.
 Hang the module on the hat rail.
Important! Make sure that the shielding spring fits correctly.
The shielding spring of the module must be placed onto the hat rail so that it is secure and
has good electrical contact.
 Fold the module onto the hat rail.
 Using a screwdriver, move the snap-on foot against the hat rail until the snap-on foot lat-
ches into position with an audible click.
 Make sure that the module is securely seated on the hat rail.
Attempt to pull the module from the hat rail using slight pressure. If the module stays
connected to the hat rail during this test, then the installation is correct.
 If you are installing multiple modules:
Push the individual modules together in the direction of the arrow until the lateral plug
connection between the modules audibly latches into position.
Wieland Electric GmbH | BA000966 | 08/2017 [8151]
Installing/removing
62

Advertisement

Table of Contents
loading

Table of Contents