5.7 Verifying the Installation

To ensure that the SUN2000 runs normally, check the SUN2000 after installation.
Check the following items after installing the SUN2000:
1.
2.
3.
4.
5.
6.
7.
8.
9.
10. Idle USB ports are plugged with covers.
11. Idle waterproof cable connectors are plugged and the locking caps are tightened.

5.8 Closing the Maintenance Compartment Door

Close the maintenance compartment door as described in this section.
Procedure
Step 1 Install the AC terminal cover, as shown in
Issue 03 (2017-04-01)
The SUN2000 is installed correctly and securely.
All AC switches are OFF.
No cable deteriorates.
All ground cables are connected correctly, without open circuits or short circuits.
All AC output power cables are connected correctly, without open circuits or short
circuits.
The DC input voltage is less than or equal to 1000 V and in the local voltage range.
All DC input power cables are connected correctly, without open circuits or short
circuits.
All RS485 communications cables are connected correctly, without open circuits or short
circuits.
Idle DC input terminals are sealed.