Installation; Checking Before Installation - Huawei SUN2000-(25KTL, 30KTL)-US User Manual

Hide thumbs Also See for SUN2000-(25KTL, 30KTL)-US:
Table of Contents

Advertisement

SUN2000-(25KTL, 30KTL)-US
User Manual
Context
Do not install the SUN2000 in a place where personnel are likely to come into contact with its
enclosure and heat sinks. These parts are extremely hot during operation.
The installation should comply with the local national installation specifications.

4.1 Checking Before Installation

Checking the Outer Packing
Before unpacking the SUN2000, examine the outer packing for damage such as holes and
cracks. If any such damage is found, do not unpack the SUN2000 and contact the dealer
immediately.
Issue 03 (2017-04-01)
Do not install the SUN2000 on flammable building materials.
Do not install the SUN2000 in an area that stores flammable or explosive materials.
Remove the outer packing only 24 hours before installation.
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
4

Installation

4 Installation
18

Advertisement

Table of Contents
loading

Table of Contents