STRIKEMASTER Lithium 40v Owner's Manual page 18

Lithium ion battery
Hide thumbs Also See for Lithium 40v:
Table of Contents

Advertisement

OPERATION
CHARGING PROCEDURE
NOTE: The Battery Pack is not shipped fully charged. It is recommended to fully charge before fi rst use to ensure
that maximum run time can be achieved. This lithium-ion battery will not develop a memory and may be charged
at any time.
LOW VOLTAGE CHARGING
If the battery has been stored with little to no charge for a long period of time, the charger will go into recovery
mode, which will take 20 hrs. to fully charge the battery. This will enhance the life of the battery. Once it is fully
charged, the next charge will return to standard charging.
A fully discharged battery pack will require approximately 150 minutes (2.2Ah) to fully charge from a
discharged state.
1. Plug the Charging Base into an AC power outlet.
2. Insert the Battery into the Charging Base.
This is a diagnostic charger. The Charging Base LED Lights will illuminate in specifi c order to communicate the
current battery status. They are as follows:
BATTERY
CHARGING BASE
CHARGER LED LIGHTS
FALSE DEFECT NOTE
When the Battery is inserted into the Charging Base and the status LED blinks RED, remove the Battery from the
charger for 1 minute, then reinsert. If the status LED blinks GREEN, then the Battery is properly charging. If the
status LED is still blinking RED, remove the Battery and unplug the Charging Base for 1 minute. After 1 minute,
plug in the Charging Base and reinsert the Battery. If the status LED blinks GREEN, then the Battery is properly
charging. If the status LED is still blinking RED, the Battery is defective and needs to be replaced.
NOTE: When the red indictor fl ickers, pull out the Battery from the Charging Base and insert again within 2 hours.
If the indicator shows charging, that means the Battery is good. After 2 hours, please pull out the Battery and also
pull out the AC power plug of the Charging Base for 1 minute, and then insert the AC power plug and the Battery
again. If the indicator shows charging, that means the Battery is good. If not, the Battery needs to be replaced.
OPERATION
CHARGING BASE MOUNTING
1. This Charging Base can be installed hanging on a wall using two screws (not included)
2. Locate the placement for the Charging Base to be wall mounted.
3. If fastening to wood studs use 2 wood screws.
4. Drill two holes 2-3/8" (6 cm) on center ensuring they are level.
5. If fastening to drywall use wall anchors and screws to secure the Charging Base to the wall.
6. This power unit is intended to be correctly orientated in a vertical or fl oor mount position.
NOTE: If the Battery and the Charging Base won't be used for a long time, remove the Battery from the Charging
Base and unplug the AC power plug.

Hide quick links:

Advertisement

Table of Contents
loading

Related Products for STRIKEMASTER Lithium 40v

This manual is also suitable for:

Lfv-cb

Table of Contents