BEFORE STARTING
CAUTION
The engine's exhaust contains harmful emissions.
ALWAYS have adequate ventilation when operating.
Direct exhaust away from nearby personnel.
WARNING
NEVER manually start the engine with the main, or
auxiliary circuit breakers in the ON (closed) position.
If applicable perform the following:
„ Apply commercial power to the internal battery charger
receptacle (to ensure good starting) via commercial
power. An external power cord will be required. This
capability is an option.
„ Apply commercial power to the jacket water heater
receptacle (not necessary for warm climates) via
commercial power. An external power cord will be
required. This capability is an option.
1. Press the main circuit breaker "OFF" pushbutton switch
(Figure 24).
Figure 24. Main Circuit Breaker OFF Switch
2. Verify that the main circuit breaker "OFF"
lamp (Figure 25) is lit (ON).
Figure 25. Main Circuit Breaker OFF Lamp
PAGE 32 — DCA1100SSC 60 HZ GENERATOR • OPERATION MANUAL — REV. #1 (01/17/18)

GENERATOR STARTUP PROCEDURE (MANUAL)

OFF
OFF
3. Connect the load to the UVWO bus bar terminals as
shown in Figure 26. These load connection points can
be found on the output terminal panel. To gain access
to the UVWO bus bar terminals unlock the access
cover and lift the door.
VOLTAGE
OUTPUT
TERMINALS
V
U
R E
B L
A C
K
Figure 26. Load Connections
4. Tighten the UVWO terminal nuts securely to prevent
load wires from arcing.
5. Close all enclosure doors (Figure 27)
Figure 27. Enclosure Doors
N
G R E E
G R
O U
D .
N D
G N
O
W
W H
I T E
B L
U E
N E
U T
R A
D
L
L O
A
D
INCORRECT
CORRECT

Advertisement

Table of Contents
loading

Table of Contents