FORWARD Foreword The AERCO MFC Series boilers are modulating and condensing units. The MFC Series represents a true industry advancement that meets the needs of today's energy and environmental concerns. Designed for application in any closed loop hydronic system, the MFC Series modulating capability relates energy input directly to fluctuating system loads.
Page 4
MFC Series Boilers Installation, Startup Operation FORWARD (This page intentionally blank) AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913 Page 4 of 58 OMM-0104_0B Ph.: 800-526-0288 2/28/2018 GF-148...
In addition to all the requirements included in this AERCO Instruction Manual, the installation of units MUST conform with local building codes, or, in the absence of local codes, ANSI Z223.1 (National Fuel Gas Code Publication No. NFPA-54) for gas-fired boilers and ANSI/NFPASB for LP gas-fired boilers, as well as NFPA 31 “Standard...
3. Inspect exhaust vent and air inlet duct work (if applicable). 4. Perform initial startup per Chapter 5. 5. Perform scheduled maintenance procedures per Chapters 5 of this manual. AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913 Page 6 of 58 OMM-0104_0B Ph.: 800-526-0288...
248 CMR 5.08(2)(a)1 through 4. (b) EXEMPTIONS: The following equipment is exempt from 248 CMR 5.08(2)(a)1 through AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913 Page 8 of 58 OMM-0104_0B Ph.: 800-526-0288...
Page 9
____________________________________________________________________________ [End of Extracted Information From 248 CMR 5.08 (2)] AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913 OMM-0104_0B Page 9 of 58 Ph.: 800-526-0288...
Page 10
MFC Series Boilers Installation, Startup Operation SECTION 1: SAFETY PRECAUTIONS (This page intentionally blank) AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913 Page 10 of 58 OMM-0104_0B Ph.: 800-526-0288 2/28/2018 GF-148...
The warranty shall be valid only upon compliance with the instruction given in this manual. The AERCO MFC Series boilers have been built and tested in observance of ASME requirements and UL when ordered with a factory supplied burner.
60 degree delta T across the heat exchanger. AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913 Page 12 of 58 OMM-0104_0B Ph.: 800-526-0288...
Page 13
MFC3000-6000 : 2” NPT LOW TEMP CONDENSATE DRAIN RETURN DRAIN MFC8000-10000 : 3” NPT FLANGED Figure 2-1: MFC Series Dimensional Drawing AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913 OMM-0104_0B Page 13 of 58 Ph.: 800-526-0288 GF-148 2/28/2018...
Page 14
MFC Series Boilers Installation, Startup Operation SECTION 2: INTRODUCTIONS (This page intentionally blank) AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913 Page 14 of 58 OMM-0104_0B Ph.: 800-526-0288 2/28/2018 GF-148...
The MFC series boiler dimensions and minimum acceptable clearances are shown in Figures 3- 1 and 3-2. The minimum clearance dimensions, required by AERCO, are listed below. However, if Local Building Codes require additional clearances, these codes shall supersede AERCO’s requirements.
Page 16
Figure 3-1: MFC Series – Single Unit Installation Clearances AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913 Page 16 of 58 OMM-0104_0B Ph.: 800-526-0288...
3.3 Boiler Room Current regulations must always be observed. Premises in which boilers will be installed should be sufficiently ventilated and permit access for maintenance operations. AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913 OMM-0104_0B Page 17 of 58 Ph.: 800-526-0288...
See Section 3.13 for gas train installation instructions. Figure 3-3: MFC Series – Water Connections and Components Example AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913 Page 18 of 58 OMM-0104_0B Ph.: 800-526-0288 2/28/2018...
National Electrical Code (NEC), ANSI/NFPA 70 and/or the Canadian Electrical Code (CEC) Part I, CSA C22.1 Electrical Code. AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913 OMM-0104_0B Page 19 of 58 Ph.: 800-526-0288...
USES WRENCH OPENING-SIDE HINGE-SIDE SAME HINGES ON BOTH SIDES WASHER & NUT Figure 3-4: Factory Installed Burner Door Hardware Configuration AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913 Page 20 of 58 OMM-0104_0B Ph.: 800-526-0288 2/28/2018 GF-148...
3. Use the door opening tool to loosen upper left nut & washer and remove. STEP 3: Figure 3-6: Removing Upper Left Nut and Washer with Door Opening Tool AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913 OMM-0104_0B Page 21 of 58 Ph.: 800-526-0288...
Page 22
When cross-changing the barrel nuts, always make sure that the other two barrel nuts are fastened, so that they hold the door. WARNING! NEVER REMOVE ALL FOUR BARREL NUTS AT THE SAME TIME! AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913 Page 22 of 58 OMM-0104_0B Ph.: 800-526-0288...
If the boiler door is not seating over the boiler opening properly, or if there are problems inserting the barrel nuts over the hinge bolts, perform the following. AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913 OMM-0104_0B Page 23 of 58 Ph.: 800-526-0288...
Page 24
Figure 3-11: Example Problem for Adjusting Vertical Adjustment Nut on Hinge AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913 Page 24 of 58 OMM-0104_0B Ph.: 800-526-0288 2/28/2018 GF-148...
Page 25
Figure 3-12: Adjusting Horizontal Adjustment Nut on Hinge For any problems related to the reversal and adjustment of the door, we recommend contacting AERCO technical support team at 1-800-526-0288. AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913 OMM-0104_0B Page 25 of 58 Ph.: 800-526-0288...
(examples shown in Figure 3-14) for ease of maintenance of the 4th pass. Figure 3-14: Condensate Drain Diverting Valves for Duel Fuel Applications (Provided By Others) AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913 Page 26 of 58 OMM-0104_0B Ph.: 800-526-0288...
MFC Series Boilers Installation, Startup Operation SECTION 4: STARTUP 3.12 Burner/Blower Refer to the Figure 3-16 for location of blower/burner gas and oil connections for AERCO supplied Riello burners. REVERSIBLE GAS INLET CONNECTIONS Figure 3-16: Blower/Burner Gas and Oil Connection Locations 3.12.1...
Alternate material may be used as insulating material if necessary. BLOWER/BURNER BLAST TUBE THERMAL INSULATION (WHITE) Figure 3-17: Thermal Insulation AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913 OMM-0104_0B Page 29 of 58 Ph.: 800-526-0288 GF-148...
SECTION 4: STARTUP 3.13 Gas Train Installation The gas train for Riello burners acquired from AERCO is shipped loose and must be assembled and installed at the site, as shown below. Electrical connections for gas train components are shown in Appendix A.
For more information concerning water quality and requirements, see the MFC Boiler Application Guide, GF-148-B. AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913 OMM-0104_0B Page 31 of 58 Ph.: 800-526-0288...
) level of 6% minimum for all firing rates with a smoke level less than • Maintain Carbon Di-Oxide level of 11% maximum for all firing rates with a smoke level less than 1. AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913 Page 32 of 58 OMM-0104_0B Ph.: 800-526-0288...
CAUTION: Before performing any maintenance on the boiler, ensure that the electrical connections and grounds have been made according to current standards. AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913 OMM-0104_0B Page 33 of 58 Ph.: 800-526-0288...
If a more thorough cleaning is necessary, the Stainless Steel 4th Pass has a total of eight (8) access ports to allow cleaning from the backside of the boiler. See next maintenance item for 4 Pass cleaning procedure. AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913 Page 34 of 58 OMM-0104_0B Ph.: 800-526-0288...
5. Once cleaning is complete, close all access ports, and resume operation of the unit. • Check the integrity of the electrical system on the boiler. • Perform a combustion testing and adjust as necessary. AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913 OMM-0104_0B Page 35 of 58 Ph.: 800-526-0288 GF-148...
Disconnect the electricity supply from the burner by means of the main switch of the system. • Close the fuel interception tap. AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913 Page 36 of 58 OMM-0104_0B Ph.: 800-526-0288...
Connect the safety and control devices supplied with the boiler to the burner control terminals shown below AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913 OMM-0104_0B Page 37 of 58 Ph.: 800-526-0288...